My favorites | Sign in
Project Home Downloads Wiki Issues Source
READ-ONLY: This project has been archived. For more information see this post.
Search
for
MeetingAgendaFeb20  
Updated Feb 20, 2012 by cj...@nd.edu

EPICS Meeting Minutes Feb 20, 2012

1) (10 min) Subversion recap and troubleshooting

  • Able to do some testing with the PHP, hope to work with the database this coming week
  • Getting up to speed with SVN
    • Henry's email outlines svn usage for unix (ubuntu or mac)

2) (15 min) Database Requirements for the Red Cross

-Are any changes necessary?

  • The amount of search options is verbose, maybe we should combine the various searches into the general search
    • Maybe combine them into "general" and "detailed" search
  • In the "Add organization page"
    • Add Fulton county to red cross units
    • Is the "initials" option at the bottom necessary?
    • A space for the NSS ID/Code (8 character alphanum code)

-New Functionality?

  • Search nearby function, by address or zipcode etc.
    • Either by distance or number
    • Using the Google API, Matt

-Other thoughts

  • Interns will upload the data and parse through to check correct records
    • For example, there is a listing for bean inc from florida? (a test record that needs to be deleted)
    • Tech support on our end might be required to "train" the interns

3) (15 min) PHP and database high-level talk

-Systematic way of checking for bugs?

  • When are we ready to go "beta"?
    • So that the customer can find bugs without unnecessary pain
    • Test plan?
  • Firefox plugin Selenium
    • Someone to do some research and report on it next week, Chas
    • website debugging tool

-How is everything laid out and connected?

  • Is the database being backed up? Where?

4) (10 min) Mobile App Developments and catch-up

  • Currently setting up database
    • Or ... actually going to use whatever Dan had in place?
  • In two weeks, will have something to demo
    • In emulation

5) Closing remarks, assignments for next week

  • PHP & database programmers meet as a group to start working on it

  • Add these bugs laid out on the meeting to the issues in Google Code

  • When is a reasonable deadline for testing?
    • Before Spring Break?
  • Skip meeting next monday
    • And by the following monday (mar 5) have something ready to demo
      • And best case, something for the interns to use and begin to upload data to
      • 20 minutes database, 10 minutes mobile
Powered by Google Project Hosting