| Issue 26: | Adding plus one rib or mm for calculation | |
| 1 person starred this issue and may be notified of changes. | Back to list |
PK, PL, PM termékcsalád esetében új config-ot kell definiálni, mert nem adunk hozzá még egy egységet az ár alapjául szolgáló mennyiségez, azaz a szabály így néz ki: piece price = rib number or mm number (+1) multiplied with unit price if belt, sleeve price if sleeve was chosen
Jan 11, 2013
Project Member
#1
gzoli71
Labels:
-Browser-Firefox Browser-All
Jan 11, 2013
(No comment was entered for this change.)
Cc:
tam...@gmail.com
Jan 14, 2013
We agree with your proposal please go ahead with modifying the config.
Jan 14, 2013
(No comment was entered for this change.)
Status:
Accepted
Jan 14, 2013
I have changed the description of Config 3 to: piece price = rib number or mm number + "cutting cost" multiplied with unit price if belt, sleeve price if sleeve was chosen. „on request” if belt and price unit is mm and length <6 mm The "cutting cost" is added to the parameters of excel for config 3.
Status:
Started
Jan 14, 2013
I'm done with the programming. I'm passing the ownership to Tamas now to add the column cutCost to the excel. The documentation is updated with the cutCost.
Owner:
tam...@gmail.com
Labels: Milestone-1.4
Jan 16, 2013
Done in excel version 130115.
Status:
Done
Feb 14, 2013
(No comment was entered for this change.)
Status:
Verified
|