My favorites | Sign in
Project Home Downloads Wiki Issues Source
READ-ONLY: This project has been archived. For more information see this post.
Search
for
PreDesignAssigments  

Phase-Design
Updated Nov 26, 2008 by rohitm...@gmail.com

# the assignments of the pre design deliverables

Assignments

Phase One: Writing

  • Preliminary Design:
    • ExecSummary: Rohit (100%)
    • Index: Yu (0%, no entries labeled)
    • TOC+LOF+LOT: Yu (100%)
    • Introduction: Rohit (100%)
    • Architecture: Yu (100%)
    • DB schema: Naga (95%)
    • UI: Rohit (75%)
    • Modules: Yu (100%)
    • System Interfaces: Rohit, Naga, Yu (100%)
    • Exception Handling: All (50%)
    • Test plan: Naga (100%)
    • Glossary: Naga (50%)

(Appendixes:)

  • List of Requirements Changes: Yu (100%)
  • Coding Standards: Yu (100%)

Phase Two: Proofreading and Cross-checking

  • Preliminary Design:
    • ExecSummary: Rohit (100%)
    • Index:
    • TOC+LOF+LOT: (N/A)
    • Introduction: Rohit (100%)
    • Architecture: Rohit (100%)
    • DB schema: Rohit (100%)
    • UI: Rohit (100%)
    • Modules: Rohit (100%)
    • System Interfaces: Rohit (100%)
    • Exception Handling: Rohit (100%)
    • Test plan: Rohit (100%)
    • Glossary:

(Appendixes:)

  • List of Requirements Changes: Rohit (100%)
  • Coding Standards: Rohit (100%)

Powered by Google Project Hosting