My favorites | Sign in
Project Home Downloads Wiki Issues Source
READ-ONLY: This project has been archived. For more information see this post.
Search
for
DetailedDesignTaskAssignments  
Updated Jan 28, 2009 by rohitm...@gmail.com

# Task assignments for the detailed design deliverables:

Assignments

Phase One: Writing

  • Detailed Design:
    • ExecSummary: Rohit
    • Index: Yu
    • TOC+LOF+LOT: Yu
    • Introduction: Rohit
    • Architecture: Yu
    • DB schema: Naga
    • UI: Rohit
    • Modules: Yu
    • System Interfaces: All
    • Exception Handling: All
    • Test plan: Naga/All
    • Glossary: Naga

(Appendices:)

  • Coding Standards: Yu

Phase Two: Proofreading and Cross-checking

  • Preliminary Design:
    • ExecSummary: Rohit
    • Index: Yu
    • TOC+LOF+LOT: Yu
    • Introduction: Rohit
    • Architecture: Rohit
    • DB schema: Rohit/Naga
    • UI: Rohit
    • Modules: Rohit/Yu
    • System Interfaces: Rohit/Yu
    • Exception Handling: Rohit/Naga
    • Test plan: Rohit/Naga
    • Glossary: Rohit

(Appendices:) Coding Standards: Rohit

Powered by Google Project Hosting