Issue 513: End before start after resizing from month view
Status:  Done
Owner: ----
Closed:  Aug 2010
Reported by ada...@gmail.com, Jun 10, 2010
revertFunc does not properly revert the end time of an event if after resizing an event from month view, it winds up with it's end time being earlier than it's start time. It will properly revert the day, however it sets the end time equal to the start time.
Jun 16, 2010
Project Member #1 adamrs...@gmail.com
thanks for the report, but could you post an example file, along with very precise instructions on where to drag, etc? thanks a lot
Aug 25, 2010
Project Member #2 adamrs...@gmail.com
(No comment was entered for this change.)
Status: Done