| Issue 477: | with firstDay=1, event spans across wrong week | |
| 1 person starred this issue and may be notified of changes. | Back to list |
To reproduce : set allDayDefaut on false take an event on two days. If the event finish on midnight plus seconds (<60), render fail on month view. See testcase (same attached) http://dl.dropbox.com/u/326648/test_case_fullCalendar.html
Jun 15, 2010
Project Member
#1
adamrs...@gmail.com
Jun 16, 2010
Events in the test case are in May. One event (the BAD one) is too long (a week) "start":"1272822975","end":"1272837609" On UTC +2 : start = sunday 2 may 2010, 19:56:15 (UTC+0200) end = monday 3 may 2010, 00:00:09 (UTC+0200) So 4h, not a week. Sorry, I was not clear enought
Jun 16, 2010
screenshot attached
Jun 16, 2010
thanks for the report. i have recreated this bug and will fix it in the next release. sorry for the trouble. ps- the bug doesnt have anything to do with allDayDefault, instead, something lower level in the event rendering
Summary:
with firstDay=1, event spans across wrong week
Status: Accepted
Jun 17, 2010
thanks. ps- you rock ;) (you, fullCalendar and scrapemark)
Jul 5, 2010
alright, released 1.4.7, which fixes this issue. please let me know if any more problems like this. thanks
Status:
Fixed
Aug 13, 2013
(No comment was entered for this change.)
Status:
Implemented
Aug 13, 2013
(No comment was entered for this change.)
Status:
Released
|
|
| ► Sign in to add a comment |