My favorites | Sign in
Project Home Issues
New issue   Search
for
  Advanced search   Search tips   Subscriptions
Issue 2132: Agenda views, when RTL, should have axis on right
1 person starred this issue and may be notified of changes. Back to list
Status:  Released
Owner:  ----
Closed:  Aug 2014


Sign in to add a comment
 
Reported by kneid...@gmail.com, Apr 10, 2014
Hi

i have been appreciative of the RTL mode that was introduced - but in AgendaWeek mode, the times still appear down the left of the table. 

in RTL mode, this column should be moved to the RIGHT side of the calendar.

Thanks!

Apr 29, 2014
#1 kneid...@gmail.com
OK, i have figured out how to relatively simply switch around the columns:
apply 'direction: rtl' to both the 'fc-agenda-slots' and 'fc-agenda-days' tables.

What remains is to try figure how to change the spacing of the events, to now shift more to the left, as the time slow columns is no on the right, not the left.

Any ideas?

thank you
Jun 5, 2014
Project Member #2 adamrs...@gmail.com
 Issue 2076  has been merged into this issue.
Jun 5, 2014
Project Member #3 adamrs...@gmail.com
(No comment was entered for this change.)
Summary: Agenda views, when RTL, should have axis on right (was: FIX: in RTL mode - hour column should be down the right)
Status: Accepted
Labels: Type-Behavior
Jun 5, 2014
Project Member #4 adamrs...@gmail.com
Here is an implementation of this, via @bflanaganellucian:
https://github.com/arshaw/fullcalendar/pull/113

I have not tested this nor updated it to work w/ v2 fyi
Jun 6, 2014
#6 kneid...@gmail.com
this is great, thanks. though the spacing is still off a little, on the right side.

Would love to this maintained in v2
Jun 15, 2014
Project Member #7 adamrs...@gmail.com
(No comment was entered for this change.)
Labels: milestone-skeleton
Jul 23, 2014
Project Member #8 adamrs...@gmail.com
This is fixed in v2.1 (beta)
http://blog.arshaw.com/1/post/2014/07/fullcalendar-210-beta.html

I would really appreciate if you could verify this. Thanks a lot!
Aug 14, 2014
Project Member #9 adamrs...@gmail.com
(No comment was entered for this change.)
Status: Implemented
Aug 26, 2014
Project Member #10 adamrs...@gmail.com
This issue has been resolved with the official release of v2.1.0:
http://blog.arshaw.com/1/post/2014/08/fullcalendar-210-released.html

Please post any follow-up bug reports or feature requests as separate issues. Thanks.
Status: Released
Sign in to add a comment

Powered by Google Project Hosting