My favorites | Sign in
Project Home Issues
New issue   Search
for
  Advanced search   Search tips   Subscriptions
Issue 2078: Scroll while dragging past bottom or top of screen
2 people starred this issue and may be notified of changes. Back to list
Status:  Released
Owner:  ----
Closed:  Aug 2014


Sign in to add a comment
 
Reported by ignaciot...@gmail.com, Jan 28, 2014
If i try to move an event up or down past bottom or top of screen, the day, month or week view doesn't sroll.

Thanks.
Jun 7, 2014
Project Member #1 adamrs...@gmail.com
(No comment was entered for this change.)
Status: Invalid
Jun 11, 2014
#2 rajas...@gmail.com
Hi, Can you let us know why this is invalid ? I have a similar problem and trying to see if it is being considered in an official release.

Basically, when we drag an event beyond the viewport of a screen, the scrolling stops and so becomes unusable.
Jun 11, 2014
Project Member #3 adamrs...@gmail.com
If it's a bug, i need a recreation: http://arshaw.com/fullcalendar/wiki/Reporting-Bugs/

but if it's a "feature", it's a little unclear to me...

i just tested it out... when you drag around an event in month view, basicWeek, basicDay, or the all-day slot in the agenda views, the browser *does* scroll when you move the event to the edges. Timed events in agenda view do *not* seem to do this, however. Is this what you are asking for? What kind of events don't have the behavior you desire?
Status: Discussing
Aug 25, 2014
Project Member #4 adamrs...@gmail.com
I reread this issue. Seems like you want the view to automatically scroll when the event is dragged too far up or too far down? Similar to  Issue 1025  (which deals with scrolling while *resizing*).

If so, I have implemented this in 2.1.0, which I'm about to release.

If this is not what you are desiring, please open a new issue with a much more specific description of what you want. For example, what do you want to scroll: the whole window, or just the view?
Status: Implemented
Labels: Type-Feature milestone-skeleton
Aug 26, 2014
Project Member #5 adamrs...@gmail.com
This issue has been resolved with the official release of v2.1.0:
http://blog.arshaw.com/1/post/2014/08/fullcalendar-210-released.html

Please post any follow-up bug reports or feature requests as separate issues. Thanks.
Status: Released
Aug 26, 2014
#6 ignaciot...@gmail.com
Great, thanks!
Sign in to add a comment

Powered by Google Project Hosting