| Issue 1102: | Multiday events | |
| 1 person starred this issue and may be notified of changes. | Back to list |
Hello, I have an event that begins on, let's say, Friday at 11pm and ends at 5am the day after. So in the Month View, my event is on 2 days. So I wonder if it could be possible to have a parameter that set the hour that an event must end at least to be considered "during on the other day". So that in my example, I set the parameter to 7am so since my event only last until 5am, it will not be display on Saturday. I hope I was clear. Thanks!
Sep 6, 2011
Project Member
#1
althaus.it
Status:
Duplicate
|
|
| ► Sign in to add a comment |