| Issue 128: | Events overflowing over day headers. | |
| 1 person starred this issue and may be notified of changes. | Back to list |
What steps will reproduce the problem? 1. Add events to calendar. 2. View Calendar What is the expected output? What do you see instead? I expected the events to flow within the day. The events flow over the day header on the day below in the calendar. If I move the calendar forward 1 month the flowing is corrected. If I move back to the previous month the flowing correct. What version of the product are you using? On what operating system? Full Calendar v1.3; Vista SP2; Firefox 3.5.3 Please provide any additional information below.
Oct 15, 2009
That's not a bad idea and seems like something the developer could add to the plug-in very easily.
Nov 10, 2009
Hello all, This is a good feature. I don't think it should be part of the core, however. i am going to make a simple add-on architecture in an upcoming release, so 3rd party developers can do these sorts of things on their own. Will keep this thread updated. Thanks, adam
Nov 26, 2009
DrPennybags, back to the original issue (which should be considered a real bug b/c even large events shouldn't overlap headers)... i can't reproduce this. are you doing anything strange with custom css? can you send me your html/css files so i can test? thanks a lot.
Dec 2, 2009
I figured out what the problem was and it had nothing to do with the FullCalendar. Thanks for the follow-up. Sorry I didn't respond back, it kind of slipped my mind.
Dec 3, 2009
got it. thanks for letting me know
Status:
Done
Dec 20, 2009
hello. a new, related issue has just been started here: https://code.google.com/p/fullcalendar/issues/detail?id=243 |
|
| ► Sign in to add a comment |
36.2 KB View Download