| Issue 1025: | Event resizing should automatically scroll (agenda view) | |
| 4 people starred this issue and may be notified of changes. | Back to list |
Steps (times are examples): * Set your agenda view to display 8 AM to 8 PM * Set a 2 hours event at 5PM * Resize the event and hit the bottom of the agenda, as if you want to set the endDate at 10PM The agenda should scroll for us to be able to set an endDate in the hidden portion of the agenda.
Jul 19, 2011
Project Member
#1
adamrs...@gmail.com
Status:
Done
Jul 20, 2011
I'm sorry I wasn't clear enough. What I meant is that your calendar must be set to a full day (0-24), the height of the content makes it scrollable. Then, set your content area to be able to scroll down a little bit, let say that your last visible hour is 8PM. Then, you take an event that ends at 6PM and try to resize it to 10PM. The scrollable area should scroll down to let you resize the event. I don't know if i'm clearer this time.
Aug 21, 2011
got it. i understand now
Summary:
Event resizing should automatically scroll (agenda view)
Status: Maybe
Aug 13, 2013
(No comment was entered for this change.)
Status:
Accepted
Labels: Type-BehaviorMod
Aug 14, 2013
(No comment was entered for this change.)
Labels:
-Type-BehaviorMod Type-Feature
Aug 25, 2014
(No comment was entered for this change.)
Status:
Implemented
Labels: milestone-skeleton
Aug 26, 2014
This issue has been resolved with the official release of v2.1.0: http://blog.arshaw.com/1/post/2014/08/fullcalendar-210-released.html Please post any follow-up bug reports or feature requests as separate issues. Thanks.
Status:
Released
|
|
| ► Sign in to add a comment |