"ID","Type","Status","Milestone","Summary","AllLabels","Stars"
"771","","Duplicate","","Drag and drop between two calendars","","1"
"770","","Duplicate","","Select date and time just like outlook in weekAgenda view.","","1"
"769","Bug","Released","date","timeFormat brackets think same day-of-week is same day","Type-Bug, milestone-date","1"
"768","Feature","ExportedToGithub","","Robust options to control initial scroll for Agenda views","Type-Feature","4"
"767","Enhancement","Done","","Multiple Days in the same Line","Type-Enhancement","1"
"766","","Duplicate","","When traversing through months/days on the month/day views, the current scrollTop should be preserved","","0"
"765","","Done","","Cannot drag events between days in AgendaWeek","","1"
"764","","Done","","Updating JSON feed","","2"
"763","Enhancement","WontFix","","move month calendar forward 1 week","Type-Enhancement","1"
"762","Defect","Done","","eventRender returning false, or hidden event, results in other events not rendering properly","Type-Defect","12"
"761","","Done","","Never stops ""loading"" for empty January month","","1"
"760","Enhancement","Duplicate","","Feature Reqeust","Type-Enhancement","1"
"759","","Done","","multi day events with end 00:00","","1"
"758","","Done","","Bad performance IE8 compatibility mode","","1"
"757","Defect","Released","","new events don't 'stick' after removing an event","Type-Defect","1"
"756","Defect","Duplicate","","How to detect if calendar has rendered all events from 'eventSources'","Type-Defect","2"
"755","Defect","Done","","HTML entities not showing correctly.","Type-Defect","1"
"754","Enhancement","Released","","Ajax error callback","Type-Enhancement","1"
"753","Feature","Released","","trigger after all events have been rendered","Type-Feature","7"
"752","","Done","","Events misplaced when setting firstDay to anything other then 0.","","1"
"750","Defect","Done","","Z in ISO8601 dates (should parse as UTC)","Type-Defect","8"
"749","Feature","ExportedToGithub","","Rename timeFormat to eventTimeFormat","Type-Feature","1"
"748","","Done","","Easier overriding of default event color","","2"
"747","","Duplicate","","non-scroll header option available?","","1"
"746","Enhancement","WontFix","","date format options - timezone offset","Type-Enhancement","1"
"745","","Done","","Installation trouble - '$('#calendar').fullCalendar' [undefined] is not a function","","1"
"744","","Done","","Support eventRightClick, dayRightClick events","","1"
"743","Defect","Done","","className ","Type-Defect","1"
"742","","Duplicate","","Removing scroll from the week and day","","1"
"741","","Done","","Qtip allday event","","1"
"740","Defect","Released","","Resizing to a different week in a 5-day per week month calendar","Type-Defect","1"
"739","Feature","ExportedToGithub","","Icons on event elements","Type-Feature","5"
"738","Feature","Released","date","Specify a different working timezone than the browser timezone","Type-Feature, milestone-date","13"
"737","Defect","Done","","Calendar does not render in a hidden div","Type-Defect","3"
"736","Feature","Released","skeleton","Resize an event to a different day in agenda views","Type-Feature, milestone-skeleton","5"
"735","Enhancement","Done","","datejs conflicts","Type-Enhancement","1"
"734","","Done","","Problem with window resizing for agendaWeek and agendaDay","","2"
"733","","Duplicate","","Problem with window resize for agendaWeek and agendaDay","","0"
"732","","Duplicate","","Problem with window resizing for agendaWeek and agendaDay","","0"
"731","","Duplicate","","Problem with window resize for agendaWeek and agendaWeek","","0"
"730","","Done","","Need to enable multiple event sources from different types","","1"
"729","Enhancement","Done","","Add images to the calendar","Type-Enhancement","1"
"728","Feature","Released","skeleton","Stationary header, scrolling calendar body","Type-Feature, milestone-skeleton","11"
"727","","Done","","pass request based on select menu","","1"
"726","","Done","","Customize allday event","","1"
"725","","Duplicate","","Setting options on the fly","","2"
"724","Feature","ExportedToGithub","","Better support on iPad and mobile devices","Type-Feature","52"
"723","Enhancement","Invalid","","Sup","Type-Enhancement","1"
"722","","Duplicate","","aspectRatio supports view-option-hash","","1"
"721","","Done","","Abort ajax call","","1"
"720","","Done","","Multiple agendas side-by-side with different sources","","2"
"719","Enhancement","Done","","Allow range of hours to be shown","Type-Enhancement","1"
"718","Enhancement","Done","","eventMousemove","Type-Enhancement","1"
"717","","Done","","duplicates events with select and modal","","1"
"716","","Done","","Asynchronous refetchEvents() breaks event resizing","","1"
"715","Enhancement","Duplicate","","Year view","Type-Enhancement","3"
"714","Behavior","Released","skeleton","Run resizing events through eventRender/eventAfterRender","Type-Behavior, milestone-skeleton","1"
"713","","Done","","When deleting new event it doesn't have an id","","5"
"712","","Done","","Events merged in calendar","","1"
"711","","Done","","https local address and fullcalendar","","1"
"710","Defect","Done","","Google Chrome Rendering Bug","Type-Defect","1"
"709","Defect","Done","","eventResize, after posting data via ajax the event reverts automatically","Type-Defect","2"
"708","","Done","","Unique styling of matching events - enhancement","","2"
"707","","Done","","Custom styling of events - enhancement","","2"
"706","","Done","","Identical code displays header differently when changing directory name from fullcalendar-1.4.8","","2"
"705","Enhancement","Done","","Past days need to have option to show past days","Type-Enhancement","1"
"704","Enhancement","Done","","php","Type-Enhancement","1"
"703","Enhancement","Duplicate","","First Event width need to same size","Type-Enhancement","1"
"702","Defect","Done","","After remove() when adding new event, removed event reappears","Type-Defect","2"
"701","Defect","Done","","eventBeforeRender (callback)","Type-Defect","1"
"700","Enhancement","Duplicate","","Disable multiple events overlapping same time","Type-Enhancement","2"
"699","","Done","","click next Month","","1"
"698","","Done","","Loading function not called on initial JSON request","","1"
"697","Defect","Done","","jQuery Sortable duplicates Calendar","Type-Defect","1"
"696","","Invalid","","Use jQuery Globalization to handler all formating in source code.","","3"
"695","Enhancement","Duplicate","","Agenda week, click on Agenda Head shows clicked day","Type-Enhancement","2"
"694","","Done","","Optional Event Title HtmlEscape","","1"
"693","","Done","","Save fullcalendar configuration","","1"
"692","Feature","Released","","Arbitrary # of rows/cols in a view","Type-Feature","34"
"691","Feature","ExportedToGithub","","Min-height for agenda events. Render events by computed height","Type-Feature","15"
"690","Defect","Released","","broken links on the sample page","Type-Defect","1"
"689","","Done","","All day events span two days","","2"
"688","Defect","Released","","parseTime fails to parse time in HH:mm format","Type-Defect","1"
"687","","Done","","Month variable is wrong","","1"
"686","Enhancement","Done","","Do not display Sunday","Type-Enhancement","15"
"685","","Done","","eventSources ignored if 'array' given","","1"
"684","","Done","","gotoDate queries/fetches the data source multiple times","","1"
"683","Defect","Done","","Tip not showing in IE8","Type-Defect","1"
"682","Defect","Done","","Tip not showing in IE8","Type-Defect","2"
"681","Enhancement","Done","","Month view","Type-Enhancement","2"
"680","Enhancement","Done","","Night Events","Type-Enhancement","1"
"679","Defect","Released","","after adding multiple eventsources in a loop, events for some of the sources are not displayed ","Type-Defect","2"
"678","Feature","ExportedToGithub","","Method to remove all event sources","Type-Feature","15"
"677","Defect","Done","","Event displayed in previous month view, but not in the month view it should be displayed.","Type-Defect","1"
"676","","Done","","Improvement suggestion: Keyboard arrow navigation (Left, Right)","","1"
"675","Enhancement","Duplicate","","Make the Calendar move forward and backward through Months upto 2 years only","Type-Enhancement","1"
"674","","Done","","Date Picker Overlap on Fullcalendar events","","1"
"673","","Done","","Limit hours displayed in agendaWeek and agendaDay views","","1"
"672","Enhancement","Duplicate","","Prevent event overlapping in month/basic views","Type-Enhancement","3"
"671","","WontFix","","Different timestart","","2"
This file is truncated to 100 out of 2569 total results.  See https://code.google.com/p/fullcalendar/issues/csv?can=1&num=100&q=&colspec=ID%20Type%20Status%20Milestone%20Summary%20AllLabels%20Stars&groupby=&sort=-id&start=1900 for the next set of results.
