My favorites | Sign in
Project Home Issues Source
READ-ONLY: This project has been archived. For more information see this post.
Search
for
  Advanced search   Search tips   Subscriptions
Issue 9: Preliminary Design Report: Software Block 0 Diagram
1 person starred this issue and may be notified of changes. Back to list
 
Project Member Reported by ar...@zips.uakron.edu, Sep 7, 2012
Description of the task to be completed:
The Level 0 Software Block Diagram as part of the preliminary design report needs to be created.

Who is responsible for completing this task:
Andrew is responsible for this task.

When must this task be completed by:
This task needs to be completed by noon on Wednesday, Sept 12th.
Sep 20, 2012
Project Member #1 nj...@zips.uakron.edu
This has been completed including FR table and ToO.
Status: Done

Powered by Google Project Hosting