My favorites | Sign in
Project Home Downloads Wiki Issues Source
Search
for
Roadmap  
Neddick Development Roadmap
Featured, Phase-Requirements, Phase-Design
Updated Dec 25, 2011 by fogbeam

Introduction

For background on the versioning scheme and development process, see: http://code.google.com/p/screwpile/wiki/DevelopmentProcess

Details

TPR1

TPR1 was our previous release. It has been superseded by TPR2, see below.

TPR2

This release will feature a combination of bug-fixes, code cleanup, UI cleanup, architectural improvements, and feature enhancements. The tasks currently planned for TPR2 are:

TPR2 was our previous release. It has been superseded by TPR3, see below.

TPR3

Tasks planned for TPR3:

TPR3 is released. See https://github.com/fogbeam/Neddick/tree/tpr3

TPR4

TPR5

  • Replace the current recommender implementation with something based on Apache Mahout.
  • Add an Installer
  • ???

FUTURE

  • Add an integration point for business events and related entities to populate into the system from a SOA/ESB environment. Possibly integrate Apache Camel for this...
  • Add content filtering / selection by attributes / regexes / etc.
  • Add dynamic content routing / event creation
  • Add "guided discovery" mechanism for driving discovery of business insights from content
  • Add some sort of "status tracking" / Workflow integration for activities related to content.
  • Add concept mining / visualization
  • Add visual navigation of the "knowledge space"
  • Add "person" recommendations using Quoddy integration, as well as possibly LinkedIn, etc.

Sign in to add a comment
Powered by Google Project Hosting